CQE Exam Question 11

A process is normally distributed with a mean of 200 and a variance of 25. One item is randomly selected, what is the probability of this item having a value greater than 210?
  • CQE Exam Question 12

    An X-bar and R chart was prepared for an operation using twenty samples with five pieces in each
    sample; X-bar was found to be 33.6 and R-bar was 6.20. During production, a sample of five was taken and the pieces measured 36, 43, 37, 25, and 38. At the time, this sample was taken:
  • CQE Exam Question 13

    One-way analysis of variance is MOST similar in its objectives to
  • CQE Exam Question 14

    An X-bar and R chart with n=5 has been plotted for some time and has demonstrated random variation. Upon review of the last 30 plot points, the expected number of runs around the centerline on the X-bar chart is expected to be approximately which of the following?
  • CQE Exam Question 15

    Which of the following would be considered the WEAKEST reason to initiate an audit?