CWDP-305 Exam Question 66

You have designed a WLAN with a plan for 87 APs m a large office building. The customer has informed you that the budget is not as large as they hoped and they can only purchase 53 APs What action should be taken?
  • CWDP-305 Exam Question 67

    You have performed a validation site survey after deploying a WLAN infrastructure in an All-Wireless-Office. One specific application is experiencing delays after transitioning from wired to wireless connectivity. During validation, you discover that all APs are using 80 MHz channel widths instead of the designed 20 MHz on the 5 GHz band. What can be done to resolve the delay for this application?
  • CWDP-305 Exam Question 68

    As you plan a WLAN upgrade, you have assessed the network requirements and data signatures of your applications. One of the popular applications used on your network requires high bandwidth and low to medium Wi-Fi loss, but can tolerate moderate latency and jitter.
    What application matches this description?
  • CWDP-305 Exam Question 69

    Switches and APs have already been chosen by your customer. All switches support 802.3bz MultiGig interfaces and APs are 4x4:4 802.11ac wave 2 capable of using dual-5GHz and have one MultiGig interface. Some cable drops for the APs will run for more than 180.5 feet (or 55 meters). To support MultiGig, what is the best choice of cabling?
  • CWDP-305 Exam Question 70

    What is the most appropriate antenna which will require the least Intentional Radiator power for a point-to-point bridge link spanning 1200 meters?