300-620 Exam Question 56

In-band is currently configured and used to manage the Cisco ACI fabric. The requirement is for leaf and spine switches to use out-of-band management for NTP protocol. Which action accomplishes this goal?
  • 300-620 Exam Question 57

    An ACI engineer is implementing a Layer 3 out inside the Cisco ACI fabric that must meet these requirements:
    The data center core switch must be connected to one of the leaf switches with a single 1G link.
    The routes must be exchanged using a link-state routing protocol that supports hierarchical network design.
    The data center core switch interface must be using 802.1Q tagging, and each vlan will be configured with a dedicated IP address.
    Which set of steps accomplishes these goals?
  • 300-620 Exam Question 58

    In the context of ACI Multi-Site, when is the information of an endpoint (MAC/IP) that belongs to site 1 advertised to site 2 using the EVPN control plane?
  • 300-620 Exam Question 59

    What do Pods use to allow Pod-to-Pod communication in a Cisco ACI Multi-Pod environment?
  • 300-620 Exam Question 60

    An engineer must deploy Cisco ACI across 10 geographically separated data centers. Which ACI site deployment feature enables the engineer to control which bridge domains contain Layer 2 flooding?