350-601 Exam Question 376
A network administrator must automate the process of pinging all the IP addresses from the 10.0.0.0/8 subnet. The subnet is already present in the ARP table of the Cisco Nexus switch. Drag and drop the bash commands to generate the desired output. Not all commands are used.


350-601 Exam Question 377
A company plans to deploy a Cisco HyperFlex solution for data-intensive applications and databases The proposed solution should offer the highest performance with high consistency and low latency Which Cisco HyperFlex storage configuration should be used?
350-601 Exam Question 378

Refer to the exhibit. An engineer needs to implement streaming telemetry on a cisco MDS 9000 series switch.
The requirement is for the show command data to be collected every 30 seconds and sent to receivers. Which command must be added to the configuration meet this requirement?
350-601 Exam Question 379
Refer to the exhibit. A network engineer is implementing a configuration checkpoint on a Cisco Nexus 9000 Series Switch. The configuration must skip any existing vPC configuration errors and must complete if there are any configuration errors. The engineer finished the vPC domain configuration part. Which command completes the checkpoint implementation?


350-601 Exam Question 380
Refer to the exhibit.

What is the result of implementing this configuration?

What is the result of implementing this configuration?