350-801 Exam Question 16
Which two approaches are taken to implement CAC within Cisco UCM in full-mesh topology?
(Choose two.)
(Choose two.)
350-801 Exam Question 17
A company wants to block all users from forwarding calls to international destinations. An engineer must configure a calling search space named NATIONAL across all phones for call forwarding by using the Bulk Administration Tool. Which action must the engineer take from Bulk Administration in Cisco UCM Administration?
350-801 Exam Question 18
Refer to the exhibit. A collaboration engineer needs to replace the original, single NTP server that was configured during the initial install of a Cisco UCM server.
What is the first step to accomplish this task?

What is the first step to accomplish this task?

350-801 Exam Question 19
An engineer must configure a dial plan tor a new Cisco UCM cluster. Standard local route groups must be used for all local calls. After the route pattern, route list and route groups are configured, which settings must the engineer configure for the standard local route groups?
350-801 Exam Question 20
An engineer is designing a high availability and failover solution for two Cisco Unified Border Element routers. The first router (cube 1.abc.com) takes 60% of the calls and the second router (cube2 abc.com) takes 40% of the calls. Assume all DNS A records have been created.
Which two SRV records are needed for a load balanced solution? (Choose two.)
Which two SRV records are needed for a load balanced solution? (Choose two.)
