400-007 Exam Question 21

An enterprise organization currently provides WAN connectivity to their branch sites using MPLS technology, and the enterprise network team is considering rolling out SD-WAN services for all sites.
With regards to the deployment planning, drag and drop the actions from the left onto the corresponding steps on the right.

400-007 Exam Question 22

Company XYZ wants to deploy OSPF. The design plan requires that two OSPF networks be mutually redistributed at multiple locations and ensure end-to-end connectivity to all of the company's networks Which technology can be used to fulfill the requirements while avoiding the creation of routing loops?
  • 400-007 Exam Question 23

    Company XYZ branch offices connect to the headquarter sites using two links, MPLS and Internet. The company wants to design the traffic flow so that voice traffic goes through the MPLS link and all other traffic uses either the MPLS link or the Internet link. Which technique can the company use in their design to ensure that the traffic is not process switched?
  • 400-007 Exam Question 24

    Which two statements describe the usage of the IS-IS overload bit technique? (Choose two )
  • 400-007 Exam Question 25

    A European national bank considers migrating its on-premises systems to a private cloud offering in a non-European location to significantly reduce IT costs. What is a primary factor prior to migration?