220-1101 Exam Question 456

A technician installed a Cat 5 UTP cable approximately 275ft (84m) from a network switch in an office to a workstation located on a factory floor The technician sees both a flashing green LED and a flashing orange LED on the workstation's NIC. Which of the following should the technician do FIRST?
  • 220-1101 Exam Question 457

    A technician is adding one more line at the demarcation point. Which of the following tools would be MOST useful to accomplish this task?
  • 220-1101 Exam Question 458

    A user reports a cell phone is getting hot. Which of the following are MOST likely to be possible causes?
    (Select THREE).
  • 220-1101 Exam Question 459

    An administrator is responding to a network server outage. The administrator has logged in to the server to troubleshoot the outage. Which of the following is the first step the administrator should take when attempting to troubleshoot the issue?
  • 220-1101 Exam Question 460

    A technician is working with a vendor to resolve an issue that a user reported. The vendor indicates that the technician's next step is to update the firmware. Which of the following is the most important step the technician should take before proceeding?