N10-007 Exam Question 76
You are tasked with creating a network that will accomplish the following requirements Requirements:
1) The remote sales team must be able to connect to the corporate network
2) Each department must have ONLY two PCs and a server
3) Each department must be segmented from each other
4) The following VLANs have been designated:
a) VLAN 2- Finance
b) VLAN 12- Sales
c) VLAN 22- Human Resources (HR)
Complete the network by dragging the required objects into the diagram
INSTRUCTIONS: Objects can be used multiple times and not all placeholders need to be filled

1) The remote sales team must be able to connect to the corporate network
2) Each department must have ONLY two PCs and a server
3) Each department must be segmented from each other
4) The following VLANs have been designated:
a) VLAN 2- Finance
b) VLAN 12- Sales
c) VLAN 22- Human Resources (HR)
Complete the network by dragging the required objects into the diagram
INSTRUCTIONS: Objects can be used multiple times and not all placeholders need to be filled

N10-007 Exam Question 77
A recently constructed building makes use of glass and natural light. Users in the building are reporting poor cellular connectivity and speeds. Which of the following is MOST likely the cause?
N10-007 Exam Question 78
A network administrator discovered a rogue access point was sending a signal from inside the corporate headquarters. Which of the following would prevent the access point from providing access to the company's internal network?
N10-007 Exam Question 79
Which of the following MUST be implemented to share metrics between routing protocols within the same router?
N10-007 Exam Question 80
A technician is observing brownout issues at a smaller office. At least once a week, the edge switch power cycles. Which of the following should the technician do to resolve the issue?