PT0-001 Exam Question 26
A penetration tester is required to perform OSINT on staff at a target company after completing the infrastructure aspect. Which of the following would be the BEST step for penetration?
PT0-001 Exam Question 27
During a web application assessment, a penetration tester discovers that arbitrary commands can be executed on the server. Wanting to take this attack one step further, the penetration tester begins to explore ways to gain a reverse shell back to the attacking machine at 192.168.1.5. Which of the following are possible ways to do so? (Select TWO)
PT0-001 Exam Question 28
A penetration tester has obtained access to an IP network subnet that contains ICS equipment intercommunication. Which of the following attacks is MOST likely to succeed in creating a physical effect?
PT0-001 Exam Question 29
When communicating the findings of a network vulnerability scan to a client's IT department which of the following metrics BEST prioritize the severity of the findings? (Select TWO)
PT0-001 Exam Question 30
The results of a basic compliance scan show a subset of assets on a network. This data differs from what is shown on the network architecture diagram, which was supplied at the beginning of the test. Which of the following are the MOST likely causes for this difference?
(Select TWO)
(Select TWO)
