NSE7_SDW-7.2 Exam Question 11

The SD-WAN overlay template helps to prepare SD-WAN deployments. To complete the tasks performed by the SD-WAN overlay template, the administrator must perform some post-run tasks. What are three mandatory post-run tasks that must be performed? (Choose three.)
  • NSE7_SDW-7.2 Exam Question 12

    What are two advantages of using an IPsec recommended template to configure an IPsec tunnel in a hub-and-spoke topology? (Choose two.)
  • NSE7_SDW-7.2 Exam Question 13

    Exhibit.

    Which conclusion about the packet debug flow output is correct?
  • NSE7_SDW-7.2 Exam Question 14

    Refer to the exhibits.
    Exhibit A

    Exhibit B

    Exhibit A shows an SD-WAN event log and exhibit B shows the member status and the SD-WAN rule configuration.
    Based on the exhibits, which two statements are correct? (Choose two.)
  • NSE7_SDW-7.2 Exam Question 15

    Which two performance SLA protocols enable you to verify that the server response contains a specific value?
    (Choose two.)