HPE0-S22 Exam Question 11
A customer recently purchased an HPE Moonshot chassis to host its internal website. Subsequently, the customer reports difficulties deploying new cartridges in an efficient manner. The customer suggests exchanging the solution for a more traditional server platform.
What can the architect demonstrate to the customer to help solve the problem while preserving the validity of the original design solution?
What can the architect demonstrate to the customer to help solve the problem while preserving the validity of the original design solution?
HPE0-S22 Exam Question 12
A customer is considering upgrading from a BL460c Gen8 to a BL460c Gen9 server. The customer needs to retain the ESXI V5.5 boot volumes and enable UEFI secure boot mode on the new BL460c Gen 9 server.
What should the architect explain to the customer?
What should the architect explain to the customer?
HPE0-S22 Exam Question 13
A customer has HPE BladeSystem BL460c Gen9 blades with two processors and 512GB of memory. The blades are running a MS-SQL database on a clustered 2TB SAS virtual volume that is exported from an HPE 3PAR StoreServ 8200. The customer reports that the MS-SQL database is performing poorly.
After extensive performance trending analysis, it is determined that the database front-end I/O requirements are unpredictable and often exceed 100,000 IOPs with latency in excess
30ms at critical times.
Which solution should the architect recommend to resolve the performance issue with consideration to cost and complexity?
After extensive performance trending analysis, it is determined that the database front-end I/O requirements are unpredictable and often exceed 100,000 IOPs with latency in excess
30ms at critical times.
Which solution should the architect recommend to resolve the performance issue with consideration to cost and complexity?
HPE0-S22 Exam Question 14
Which factors must the architect consider to help define an appropriate HPE server solution to meet a customer's needs?
HPE0-S22 Exam Question 15
A customer has an Ethernet-based storage solution. The customer needs to upgrade its servers to prepare for expanding storage. The customer has spent a lot of money to update its Ethernet infrastructure, so does not want to change it.
The customer has DAS and NAS-based storage and plans to implement a Fibre Channel SAN-based storage array within the next six to eight months.
Which server-based solution meets the customer's future needs?
The customer has DAS and NAS-based storage and plans to implement a Fibre Channel SAN-based storage array within the next six to eight months.
Which server-based solution meets the customer's future needs?
Premium Bundle
Newest HPE0-S22 Exam PDF Dumps shared by Actual4test.com for Helping Passing HPE0-S22 Exam! Actual4test.com now offer the updated HPE0-S22 exam dumps, the Actual4test.com HPE0-S22 exam questions have been updated and answers have been corrected get the latest Actual4test.com HPE0-S22 pdf dumps with Exam Engine here: