HPE0-S54 Exam Question 1
A customer wants to use iLO Federation to manage firmware deployments with HPE SUM. Which options are included? (Select two.)
HPE0-S54 Exam Question 2
A customer temporarily needs to add an additional network connection to a provisioned server that is being actively managed by OneView. The server is currently powered down. Which top level option should they click as the first step?


HPE0-S54 Exam Question 3
A customer has a ProLiant DL-based server solution. The customer is experiencing I/O timeouts on their SQL data volume running on this solution. Which solution will increase the application performance?
HPE0-S54 Exam Question 4
Your customer has completed a successful Synergy Proof of Concept (PoC) consisting of a single frame with dual composers and dual Virtual Connect SE 40Gb F8 modules.
The customer wants to:
* add a second frame before they move into production
* have unified management
* have a separate logical enclosure for each frame
What are the basic steps to add the second frame? (Choose three.)
The customer wants to:
* add a second frame before they move into production
* have unified management
* have a separate logical enclosure for each frame
What are the basic steps to add the second frame? (Choose three.)
HPE0-S54 Exam Question 5
You are configuring a new server for a customer. The customer has given you the following information regarding their environment:
* 2 processors with 22 cores
* 256GB RAM
* 600GB of usable internal storage
* 10GB network, dual connections
* iLO Advanced
* 3 years of 7x24 basic support
Which additional information do not need to determine the best option for internal storage?
* 2 processors with 22 cores
* 256GB RAM
* 600GB of usable internal storage
* 10GB network, dual connections
* iLO Advanced
* 3 years of 7x24 basic support
Which additional information do not need to determine the best option for internal storage?