HPE0-S58 Exam Question 26

Which management tool required by HPE Infosight must be deployed at the customer site?
  • HPE0-S58 Exam Question 27

    A customer wants to expand their existing cluster using the Grow Cluster functionality from OneView for vCenter Server.
    Which OS build plan managed by HPE OneView for vCenter Server can the customer use?
  • HPE0-S58 Exam Question 28

    A customer needs an integrator to add HPE 3PAR StoreServ to the HPE Composer. When the integrator tries to add it, they get an error and 3PAR is not added.
    What should the integrator check that may be causing this error?
  • HPE0-S58 Exam Question 29

    An integrator has installed a new Synergy frame into a rack with two existing Synergy frames in a customer's environment.
    Click where the integrator should verify that the cabling for the management ring was completed correctly.

    HPE0-S58 Exam Question 30

    How can an integrator use an HPE Synergy D3940 storage module to provision shared storage to compute modules without requiring a separate SAN to be connected to the frame?