HPE0-V14 Exam Question 26

Place the components on the left in the correct order on the right for the recommended power-up sequence.

HPE0-V14 Exam Question 27

Match the characteristic to the correct HPE ProLiant family.

HPE0-V14 Exam Question 28

Match each workload profile description with the corresponding profile. (Select all that apply.)

HPE0-V14 Exam Question 29

A customer has requested that you provide them with an architecture and bill-of-materials for a stack of top-of- rack switches. The customer has 34 HPE DL360 servers in the rack, each with four 1GBASE-T Ethernet ports which need to be connected to the network.
The customer is upgrading 50% of the 1GBASE-T Ethernet ports on the servers to 10GBASE-T Ethernet ports and needs the switching to support the upgraded servers. They are opposed to a chassis switch, and want to keep the number of managed devices on the network to a minimum.
Which architecture meets the customer requirements?
  • HPE0-V14 Exam Question 30

    A customer is planning an upgrade to their network infrastructure. They want to move to an open networking solution, and they want to install a network switch that supports their choice of network operating system.
    Which HPE product family will meet the customer's needs?