HPE0-V14 Exam Question 121
Refer to the exhibit.

When performing a code upgrade on an HPE Nimble array, you noticed a connection failure on ESX1. Refer to the exhibit showing the complete zoning configuration of one of the HPE SN3000B switches.
What should you do to ensure storage access is not interrupted when doing the next update?

When performing a code upgrade on an HPE Nimble array, you noticed a connection failure on ESX1. Refer to the exhibit showing the complete zoning configuration of one of the HPE SN3000B switches.
What should you do to ensure storage access is not interrupted when doing the next update?
HPE0-V14 Exam Question 122
Match each ProLiant solution to its ideal use case


HPE0-V14 Exam Question 123
Match each workload profile description with the corresponding profile. (Select all that apply.)


HPE0-V14 Exam Question 124
A customer is planning to deploy a branch office server rack. The environment will have the following requirements:
* Single rack with 20 HPE ProLiant DL360 Gen10 Servers.
* Each Server will have 6 x 10G SFP+ Ports.
* Each Server will have a dedicated iLO port.
* The customer requires that only two switches be used.
* The customer requires separate control planes.
Which switch configuration can meet these requirements?
* Single rack with 20 HPE ProLiant DL360 Gen10 Servers.
* Each Server will have 6 x 10G SFP+ Ports.
* Each Server will have a dedicated iLO port.
* The customer requires that only two switches be used.
* The customer requires separate control planes.
Which switch configuration can meet these requirements?
HPE0-V14 Exam Question 125
Refer to the exhibit.

A customer needs a server with four 10Gb network adapters. They need it to be configured for the best possible network throughput.
Given the BOM in the exhibit, what do you need to add to this server to meet the customer requirement?

A customer needs a server with four 10Gb network adapters. They need it to be configured for the best possible network throughput.
Given the BOM in the exhibit, what do you need to add to this server to meet the customer requirement?