HPE6-A47 Exam Question 41
Refer to the exhibit.

A customer wants to replace the core and aggregation layer of an existing network. Currently the network
routes between the aggregation layer and core, and uses the technologies shown in the exhibit.
The customer now wants to route at the core, instead of the aggregation layer, and extend some of the same
VLANs in different buildings. However, the customer cannot eliminate the aggregation layer at this point.
What should the architect recommend?

A customer wants to replace the core and aggregation layer of an existing network. Currently the network
routes between the aggregation layer and core, and uses the technologies shown in the exhibit.
The customer now wants to route at the core, instead of the aggregation layer, and extend some of the same
VLANs in different buildings. However, the customer cannot eliminate the aggregation layer at this point.
What should the architect recommend?
HPE6-A47 Exam Question 42
How does an Aruba infrastructure calculate a wireless device's location?
HPE6-A47 Exam Question 43
Refer to the exhibit.

The exhibit shows the current plan for a wired network upgrade.
As much as possible, the customer wants to flatten the architecture and avoid recabling. However, each Building 2 switch must also maintain connectivity to the core if one link fails. What should the architect propose to meet the customer requirements?

The exhibit shows the current plan for a wired network upgrade.
As much as possible, the customer wants to flatten the architecture and avoid recabling. However, each Building 2 switch must also maintain connectivity to the core if one link fails. What should the architect propose to meet the customer requirements?
HPE6-A47 Exam Question 44
For which scenario does an Aruba VIA client provide the solution?
HPE6-A47 Exam Question 45
Refer to the exhibit. An architect determines that 80 Gbps bandwidth is required for the link aggregation between the Building 1aggregation layer and Building 2.
Which transceivers should the architect recommend for each pair of switches?

Which transceivers should the architect recommend for each pair of switches?