HPE6-A66 Exam Question 6

A network architect is designing a new wired and wireless solution for for a company. The company has two buildings on a campus, which each building has three floors. The campus core will be placed in the basement of Building 1. Each wiring closet has eight strands of multi-mode OM3 grade fiber that connect to a wiring closet of the first floor of the building it is contained, referred to as a main distribution frame (MDF). The maximum distance between a floor's wiring closet and the MDF is 100 feet (30 meters). The maximum distance between the two MDFs and the campus core is no more than 150 feet (45 meters). There are eight strands of multi-mode OM3 grade fiber from these two MDF closets to the campus core.
Based on this information, which type of design should be used and what is the maximum speeds supported all uplinks for the existing the multi-mode fiber?
  • HPE6-A66 Exam Question 7

    A high-end theater venue will be implementing an Aruba wireless solution using ceiling- and wall-mounted APs. The venue wants to ensure the the APs blend into the ceiling and wall environments. What solution should the customer use to ensure that wireless coverage is not hampered?
  • HPE6-A66 Exam Question 8

    A customer placed an order for an ArubaOS 5406R switch and plans to rack mount it in a wiring closet. The dimensions of the switch are 17.5 inches wide (44.45 cm), 6.9 inches high (17.5 cm), and 17.75 inches deep (45.1 cm). How many rack units should a customer plan for this switch?
  • HPE6-A66 Exam Question 9

    Which must you perform in IRIS to assign a device to a Design Group?
  • HPE6-A66 Exam Question 10

    When determining a customer's agenda and clarifying their expectations for a new HPE/Aruba deployment, which two questions should be asked during the stakeholder checklist? (Select two.)