HPE6-A66 Exam Question 16

A customer is purchasing Aruba 555 APs for a new wireless network. The APs will be pre-staged as campus APs (CAPs) and be managed by a controller solution During the pre-staging process, console access to the APs might be necessary Which console connection cable should the customer purchase for the 555 APs?
  • HPE6-A66 Exam Question 17

    A network architect is designing a new Wi-Fi solution for a customer The customer currently occupies a one-story building on a small campus. In one part of the building there is an auditorium, where the ceiling height and attenuation is different from the rest of the building. What should the network architect create in VisualRF to identify this difference when planning :ne APs?
  • HPE6-A66 Exam Question 18

    A company has two buildings on a campus, where each building has three floors, which two wiring closets per floor Assume that there will be 24 APs connected via POE+ to each wiring closet, along with 128 wired user connections. Which backplane stacking solution will provide the necessary Ethernet port capacity for all devices on Building 1 Floor 2 and is fully meshed?
  • HPE6-A66 Exam Question 19

    A network architect will be using VisualRF to determine the appropriate wireless coverage for a new wireless design. Seamless, uninterrupted roaming is necessary for this design, since voice will need to be supported. Given these requirements, which information should be used in VisualRF to plan a cost effective solution that meets these requirements?
  • HPE6-A66 Exam Question 20

    A wiring closet with a POE+ switch is 250 feet (76 meters) away from an AP on a building floor. The AP's smart-rate port is connected to a smart-rate port on the switch, which is capable of 10 Gbps. The cable type is Cat5e STP. What is the maximum speed that the customer can expect from the connected AP?