HPE7-A08 Exam Question 16

You've rebooted s-agg2 in a VSX configuration in an attempt to live-upgrade the cluster, and then you see this condition:

What would be the correct way to live-upgrade the VSX cluster?
  • HPE7-A08 Exam Question 17

    You have configured UBT on your CX switches, but now HTTPS-enabled websites will not load, which you suspect is due to the packet size. To resolve the issue, what should you configure on each device with funneled traffic?
  • HPE7-A08 Exam Question 18

    Drag and Drop Question
    Company A has an existing HPE Aruba Networking CX 8325 VSX. It has acquired Company B and must merge its networks onto the same VSX switch configuration as Company A.
    Both Company A and Company B share the same 10.100.100.1/21 subnet.
    What is the correct order for creating a configuration allowing overlapping networks in the setup?

    HPE7-A08 Exam Question 19

    Refer to the partial exhibit from HPE Aruba Networking CX 8325:

    If a new CX 8325 is to be deployed, which switch profile should be used to provide gateway and routing services?
  • HPE7-A08 Exam Question 20

    Refer to the exhibit for an HPE Aruba Networking CX 6300M VSF:

    What VSF configuration is required for the stack configuration to work and avoid split-brain?