HPE7-V01 Exam Question 1

Your customer has a combination of HPE and non-HPE equipment.
What is the correct functionality available in Aruba Fabric Composer for this customer's environment?
  • HPE7-V01 Exam Question 2

    Your customer wants to simplify storage management for their VMware-based environment by configuring HPE Storage Integration Pack for VMware vCenter Server. They want to use HPE OneView for VMware vCenter Server for ESXi deployment.
    Currently, they have 30 HPE ProLiant 380 Gen10 Plus deployed with ESXi 7.x and they plan to add 30 additional systems with exactly the same setup. Storage capacity is provided by HPE Alletra and HPE Primera arrays.
    Which statement about the configuration and customer requirements is correct?
  • HPE7-V01 Exam Question 3

    Your customer requires a data protection solution that will support their workloads running on an HPE Alletra MP B10000 storage array.
    Your customer requirements include:
    * Protecting VMware vSphere workloads
    * Covering different hypervisors
    * Pay-per-use model
    * Near synchronous and block-level replication
    Select the most appropriate solution.
  • HPE7-V01 Exam Question 4

    Your customer has a combination of HPE and non-HPE equipment.
    Which is the correct functionality available in Aruba Fabric Composer for this customer's environment?
  • HPE7-V01 Exam Question 5

    Your customer plans to replace a legacy HPE BladeSystem solution with the HPE Synergy platform.
    The customer requirements include:
    * 30 compute nodes to support their virtualization workloads
    * Redundancy within the management subsystem
    * An in-frame storage solution to support vSAN
    * A guidance/automation technology with HPE Aruba to virtualize WWNs
    * Simplified management with a single logical enclosure
    You are reviewing the following proposal:
    * 3 x HPE Synergy 12000 frames
    * 2 x HPE Virtual Connect SE 100Gb F32 Modules for Synergy
    * 4 x HPE Synergy 50Gb Interconnect Link Modules
    * 3 x HPE D3940 Storage Modules with maximum number of drives
    * 6 x HPE Composer2 + 30 x HPE OneView Advanced licenses
    * 30 x SY 480 Gen11 compute modules, each with 2 CPUs and appropriate mezzanine cards Which statement about the proposal is true to help meet the customer requirements?