HQT-4180 Exam Question 1
You need to replace a broken fan in a VSP E1090.
What is the correct procedure?
What is the correct procedure?
HQT-4180 Exam Question 2
How many batteries does a VSP E1090 have per controller (CTL)?
HQT-4180 Exam Question 3
Which tool can be used to change System Option Modes (SOMs)?
HQT-4180 Exam Question 4
A customer has a VSP G370 with the encryption license key installed. They now want to have all the DP-Volumes of a certain pool located on encrypted RAID Groups.
What are two requirements? (Choose two.)
What are two requirements? (Choose two.)
HQT-4180 Exam Question 5
A customer wants to change a production RAID group from RAID 5 (7D+1P) to RAID 6 (6D+2P) on a VSP G600 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?
What needs to be performed next?