H12-411_V2.0 Exam Question 41
The following air conditioners do not need to install cooling towers.
H12-411_V2.0 Exam Question 42
Lay anti-static floor, wear anti-static shoes and socks to prevent it from forming ____________ .
H12-411_V2.0 Exam Question 43
The following air conditioning, which is comfort air conditioning?
H12-411_V2.0 Exam Question 44
When the AC power equipment is introduced in the three-phase four-wire system, in addition to the grounding of the near end of the power transformer, the near end of the electrical equipment and the equipment room should be grounded repeatedly on the neutral line.
H12-411_V2.0 Exam Question 45
The dynamic environment monitoring system only has a secondary structure.