H12-421-ENU Exam Question 71
Which of the following is not part of the NetCol 5000-C30kW precision air conditioner.
H12-421-ENU Exam Question 72
If the customer load cannot be de-energized, pay attention to ( ) when disconnecting the maintenance bypass switch after the repair is completed.
H12-421-ENU Exam Question 73
The NetCol 8000-A compressor has a large amount of foam in the oil sight glass for a long time, indicating that the superheat is too large.
H12-421-ENU Exam Question 74
Which interface is not on the smart ETH socket?
H12-421-ENU Exam Question 75
When installing the Huawei air-cooled air conditioner, the refrigerant pipeline positive pressure is required to be () hours.
