H12-421 Exam Question 6
For storage batteries that have been stored for 18 months or longer, the battery that has not been recharged should be processed ().
H12-421 Exam Question 7
NeteCol can assign operational rights to user groups, or assign operational rights directly to users.
H12-421 Exam Question 8
When installing the power line on the UPS5000-E, if there are different sources on the main-lines and bypass, you need to remove the copper bars connected to the bypass and main lines first, and then connect the main circuit and bypass input respectively.
H12-421 Exam Question 9
The reason for using the EPO status interface in the parallel step of the UPS5000-E is ().
H12-421 Exam Question 10
After the NetCol5000-A25kW half-cabinet air-conditioning refrigerant pipeline is installed, do the nitrogen charge pressure maintaining, the nitrogen pressure is () Mpa.