H12-425-ENU Exam Question 126
The following air conditioning systems need to be equipped with a cooling tower or dry cooler ().
H12-425-ENU Exam Question 127
If the customer load cannot be power-off, what should be taken care when closing the maintenance bypass switch?
H12-425-ENU Exam Question 128
UPS2000-G-(6-20kVA) battery discharge time is significantly lower than the standard time may be caused by what? (Multiple choice)
H12-425-ENU Exam Question 129
Power segment function is enabled on UPS2000-G-20kVA. Which will cause the loads connected with PL terminals power- off?
H12-425-ENU Exam Question 130
Historical data can be exported from the ECC800.