H12-425 Exam Question 151
The straight pipe interval fixedly supported by NetCol5000-C piping is ()
H12-425 Exam Question 152
Which component can control the light and charge a pad in FusionModule2000?
H12-425 Exam Question 153
When UPS are connected in parallel, it is not necessary to check phase sequence.
H12-425 Exam Question 154
The operation noise of the NetCol5000-A air conditioning unit is abnormal. It should be checked whether the compressor, fan, pipeline, etc. are fixed normally and there is looseness.
H12-425 Exam Question 155
After the hot backup function is enabled for the NetCol5000-C, all the unit is settled as running unit.