H12-425_V2.0 Exam Question 76
Which of the following are the basic functions of NETECO? (Multiple choice)
H12-425_V2.0 Exam Question 77
What is the maximum capacity of the power module of the UPS5000-E?
H12-425_V2.0 Exam Question 78
The PDU8000 precision power distribution cabinet supports the monitoring of branch circuit phase current, active power, electric energy and branch circuit switch status.
H12-425_V2.0 Exam Question 79
The load is 120kW, and the UPS5000-S is used to meet the N+2 modular redundancy configuration, which can be configured with ( ) kVA models. (Fill in the blank)
H12-425_V2.0 Exam Question 80
Regarding the cabinet rPDU of FusionModule2000, which of the following statements is false?