H12-521_V1.0-ENU Exam Question 121

The basic construction of the video site includes nine parts: positioning and laying out, excavation of foundation pit, construction materials entering the site, foundation pit bottoming, grounding parts production and grounding, formwork fixing, concrete construction, exit maintenance, and muck backfilling.
  • H12-521_V1.0-ENU Exam Question 122

    The temporary list library is generated by the system when the target fortification task is created. Manually adding the " temporary list library " in the " target list library " interface is not supported.
  • H12-521_V1.0-ENU Exam Question 123

    The maintenance inspection table of the intelligent vision system can be divided into inspection categories according to the two dimensions of date and business scope.
  • H12-521_V1.0-ENU Exam Question 124

    In the basic construction stage of the video site, civil construction is an important link, which mainly includes site infrastructure construction, hand well construction, power and transmission introduction trench excavation and landfill.
  • H12-521_V1.0-ENU Exam Question 125

    When selecting the main stream for the live stream type of the device, which of the following descriptions is correct?