H35-912 Exam Question 16

The basic principle of determining the level of violation: the nature of the act, the damage caused and the severity of the impact, or whether the offender intends to make a determination.
  • H35-912 Exam Question 17

    In the process of powering up the server, which indicator status indicates that the server is in the Standby state?
  • H35-912 Exam Question 18

    If the data is improperly operated and the network construction takes place, it can be processed separately, and the relevant personnel will be informed after the network is completely restored.
  • H35-912 Exam Question 19

    In the process of replacing the signal cable and the power cable, the cable connection can be directly implemented according to the cable label. It is not necessary to perform the line sequence check according to the cable route.
  • H35-912 Exam Question 20

    What are included in the electrical safety requirements? (Multiple Choice)