AZ-120 Exam Question 81
You have a Recovery Services vault backup policy for SAP HANA on an Azure virtual machine as shown in the following exhibit.

Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.

Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.
AZ-120 Exam Question 82
You plan to deploy an SAP production landscape on Azure.
You need to estimate how many SAP operations will be processed by the landscape per hour. The solution must minimize administrative effort.
What should you use?
You need to estimate how many SAP operations will be processed by the landscape per hour. The solution must minimize administrative effort.
What should you use?
AZ-120 Exam Question 83
You have an SAP on Azure production landscape that is hosted on Standard M-series virtual machines.
You plan to expand the storage on the virtual machines.
Which type of disk can be expanded without causing downtime?
You plan to expand the storage on the virtual machines.
Which type of disk can be expanded without causing downtime?
AZ-120 Exam Question 84
You have an Azure subscription.
Your company has an SAP environment that runs on SUSE Linux Enterprise Server (SLES) servers and SAP HANA. The environment has a primary site and a disaster recovery site. Disaster recovery is based on SAP HANA system replication. The SAP ERP environment is 4 TB and has a projected growth of 5% per month.
The company has an uptime Service Level Agreement (SLA) of 99.99%, a maximum recovery time objective (RTO) of four hours, and a recovery point objective (RPO) of 10 minutes.
You plan to migrate to Azure.
You need to design an SAP landscape for the company.
Which options meet the company's requirements?
Your company has an SAP environment that runs on SUSE Linux Enterprise Server (SLES) servers and SAP HANA. The environment has a primary site and a disaster recovery site. Disaster recovery is based on SAP HANA system replication. The SAP ERP environment is 4 TB and has a projected growth of 5% per month.
The company has an uptime Service Level Agreement (SLA) of 99.99%, a maximum recovery time objective (RTO) of four hours, and a recovery point objective (RPO) of 10 minutes.
You plan to migrate to Azure.
You need to design an SAP landscape for the company.
Which options meet the company's requirements?
AZ-120 Exam Question 85
You are designing an SAP HANA deployment.
You estimate that the database will be 1.8 TB in three years.
You need to ensure that the deployment supports 60,000 IOPS. The solution must minimize costs and provide the lowest latency possible.
Which type of disk should you use?
You estimate that the database will be 1.8 TB in three years.
You need to ensure that the deployment supports 60,000 IOPS. The solution must minimize costs and provide the lowest latency possible.
Which type of disk should you use?

