DP-200 Exam Question 51
You plan to deploy an Azure Cosmos DB database that supports multi-master replication.
You need to select a consistency level for the database to meet the following requirements:
* Provide a recovery point objective (RPO) of less than 15 minutes.
* Provide a recovery time objective (RTO) of zero minutes.
What are three possible consistency levels that you can select? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
You need to select a consistency level for the database to meet the following requirements:
* Provide a recovery point objective (RPO) of less than 15 minutes.
* Provide a recovery time objective (RTO) of zero minutes.
What are three possible consistency levels that you can select? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
DP-200 Exam Question 52
SIMULATION
Use the following login credentials as needed:
Azure Username: xxxxx
Azure Password: xxxxx
The following information is for technical support purposes only:
Lab Instance: 10543936

You need to replicate db1 to a new Azure SQL server named db1-copy10543936 in the US West region.
To complete this task, sign in to the Azure portal.
Use the following login credentials as needed:
Azure Username: xxxxx
Azure Password: xxxxx
The following information is for technical support purposes only:
Lab Instance: 10543936

You need to replicate db1 to a new Azure SQL server named db1-copy10543936 in the US West region.
To complete this task, sign in to the Azure portal.
DP-200 Exam Question 53
You are responsible for providing access to an Azure Data Lake Storage Gen2 account.
Your user account has contributor access to the storage account, and you have the application ID access key.
You plan to use PolyBase to load data into Azure SQL data warehouse.
You need to configure PolyBase to connect the data warehouse to the storage account.
Which three components should you create in sequence? To answer, move the appropriate components from the list of components to the answer are and arrange them in the correct order.

Your user account has contributor access to the storage account, and you have the application ID access key.
You plan to use PolyBase to load data into Azure SQL data warehouse.
You need to configure PolyBase to connect the data warehouse to the storage account.
Which three components should you create in sequence? To answer, move the appropriate components from the list of components to the answer are and arrange them in the correct order.

DP-200 Exam Question 54
You develop data engineering solutions for a company.
A project requires analysis of real-time Twitter feeds. Posts that contain specific keywords must be stored and processed on Microsoft Azure and then displayed by using Microsoft Power BI. You need to implement the solution.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

A project requires analysis of real-time Twitter feeds. Posts that contain specific keywords must be stored and processed on Microsoft Azure and then displayed by using Microsoft Power BI. You need to implement the solution.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

DP-200 Exam Question 55
You need to set up access to Azure SQL Database for Tier 7 and Tier 8 partners.
Which three actions should you perform in sequence? To answer, move the appropriate three actions from the list of actions to the answer area and arrange them in the correct order.

Which three actions should you perform in sequence? To answer, move the appropriate three actions from the list of actions to the answer area and arrange them in the correct order.
