MB-320 Exam Question 61
A manufacturer sends wiring harnesses to a vendor to be soldered to a connector. You have created the subcontracting process in the bill of materials (BOM) and route to account for the items sent to the vendor.
You create separate subcontracting purchase orders to account for the service. You attempt to add the service item to the BOM. The system generates an error.
You need to set up a new item model group for the service item.
Which three actions should you perform? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

You create separate subcontracting purchase orders to account for the service. You attempt to add the service item to the BOM. The system generates an error.
You need to set up a new item model group for the service item.
Which three actions should you perform? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

MB-320 Exam Question 62
You are a manufacturing consultant helping a client test out different bill of material (BOM) and route consumption options when starting production orders. Material and labor consumption are to be completed before Report as finish.
You are running a production order with BOM lines that have a Flushing principle set to Start. The Automatic Route Consumption Runtime has been set to Yes.
You have set up the default Start user options for all production orders as shown in the exhibit below.


You are running a production order with BOM lines that have a Flushing principle set to Start. The Automatic Route Consumption Runtime has been set to Yes.
You have set up the default Start user options for all production orders as shown in the exhibit below.


MB-320 Exam Question 63
You are a production manager at a company that has implemented lean manufacturing using Dynamics 365 for Finance and Operations. You have created a new Kanban rule to replace one that is expiring. You need to determine the impact to the existing process jobs. How are the active Kanbans of the expired rule handled?
MB-320 Exam Question 64
You are developing a new car audio system kit. The kit configuration has restrictions based on car model, speaker size, and other expression constraints.
You need to set up a new item for the car audio system.
How should you create the new product? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

You need to set up a new item for the car audio system.
How should you create the new product? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

MB-320 Exam Question 65
A company uses Process manufacturing.
You need to review formulas and how the different ingredient types impact the batch balancing process.
Which ingredient types should you use? To answer, drag the appropriate ingredient types to the correct scenarios. Each ingredient may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

You need to review formulas and how the different ingredient types impact the batch balancing process.
Which ingredient types should you use? To answer, drag the appropriate ingredient types to the correct scenarios. Each ingredient may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.