MB-320 Exam Question 21
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some questions sets might have more than one correct solutions, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 for Finance and Operations for their Lean manufacturing environment.
There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step. The existing version must be phased out and replaced by the new version.
You need to ensure that the engineering change takes affect at the end of the month.
Solution:
1.) Edit the existing step number two activity to be the new engineering process
2.) Edit the existing production flow. Set the expiration date due to the end of the month
3.) Edit the existing Kanban rule. Set the expiration date to the end of the month
4.) Activate the production flow
Does the solution meet the goal?
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 for Finance and Operations for their Lean manufacturing environment.
There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step. The existing version must be phased out and replaced by the new version.
You need to ensure that the engineering change takes affect at the end of the month.
Solution:
1.) Edit the existing step number two activity to be the new engineering process
2.) Edit the existing production flow. Set the expiration date due to the end of the month
3.) Edit the existing Kanban rule. Set the expiration date to the end of the month
4.) Activate the production flow
Does the solution meet the goal?
MB-320 Exam Question 22
A company uses a make-to-stock strategy for their key production components.
The number of active Kanbans for these components must be constant.
You need to configure a new Kanban rule.
How should you set up the Kanban type and replenishment strategy? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

The number of active Kanbans for these components must be constant.
You need to configure a new Kanban rule.
How should you set up the Kanban type and replenishment strategy? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

MB-320 Exam Question 23
A manufacturing plant uses Lean manufacturing. Operators process Kanban consumption manually by using a mobile device.
The production team must use automatic empty registration for some of the event Kanbans. Registration must occur when the last job of a Kanban is completed.
You need to update the Kanban rule to meet this requirement.
What Kanban setting should you update?
The production team must use automatic empty registration for some of the event Kanbans. Registration must occur when the last job of a Kanban is completed.
You need to update the Kanban rule to meet this requirement.
What Kanban setting should you update?
MB-320 Exam Question 24
A company that uses Lean manufacturing concepts to produce paper plates has redesigned the layout of the warehouse and production floor.
The company's production flow activities no longer match the tasks of the workers. Employees use paper and manual communication to complete the tasks.
You need to update the production flows to match their current processes by deactivating the obsolete production flows and creating new ones.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

The company's production flow activities no longer match the tasks of the workers. Employees use paper and manual communication to complete the tasks.
You need to update the production flows to match their current processes by deactivating the obsolete production flows and creating new ones.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

MB-320 Exam Question 25
A process manufacturing company is implementing Dynamics 365 for Finance and Operations. The company will use multiple process manufacturing functionalities including by-products.
You need to configure by-product formula allocation methods.
Which methods should you use? To answer, drag the appropriate by-product burden allocation methods to the correct scenarios. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content NOTE: Each correct selection is worth one point.

You need to configure by-product formula allocation methods.
Which methods should you use? To answer, drag the appropriate by-product burden allocation methods to the correct scenarios. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content NOTE: Each correct selection is worth one point.