MB-330 Exam Question 26
Employee 1 needs to set up the new items for the product line
Which two actions should Employee1 perform? Each correct answer presents part of the solution.
NOTE Each correct selection is worth one point.
Which two actions should Employee1 perform? Each correct answer presents part of the solution.
NOTE Each correct selection is worth one point.
MB-330 Exam Question 27
A company plans to use the warehouse mobile app for cluster picking.
The system must break the cluster when stocking items.
You need to configure the system.
What should you do?
The system must break the cluster when stocking items.
You need to configure the system.
What should you do?
MB-330 Exam Question 28
You need to configure quality controls.
Which solution objects should you configure? To answer, drag the appropriate solution objects to the correct configurations. Each solution object may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Which solution objects should you configure? To answer, drag the appropriate solution objects to the correct configurations. Each solution object may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

MB-330 Exam Question 29
You are implementing containerization functionality.
You must automate containerization so that containers and picking work for shipments are created when a wave is processed. The work lines will be split into quantities to fit required containers by size.
You need to set up a container build template that defines the containerization process.
Which three items should you set up before you create the container build template? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
You must automate containerization so that containers and picking work for shipments are created when a wave is processed. The work lines will be split into quantities to fit required containers by size.
You need to set up a container build template that defines the containerization process.
Which three items should you set up before you create the container build template? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
MB-330 Exam Question 30
A caulking manufacturer is implementing Dynamics 365 Supply Chain Management. When caulking is produced, it is sold by tubes, 1-gallon cans, 5-gallon buckets, 55-gallon drums, or 330-gallon totes with potential to add other sizes.
The manufacturer wants to ensure that when new units are added, only one conversion is set up that does not require conversions between each unit of measure.
You need to configure the unit of measure to meet the requirement.
What should you use?
The manufacturer wants to ensure that when new units are added, only one conversion is set up that does not require conversions between each unit of measure.
You need to configure the unit of measure to meet the requirement.
What should you use?

