NACE-CIP1-001 Exam Question 6

Non Conformance Reports are completed by the Inspector:
  • NACE-CIP1-001 Exam Question 7

    Which of these tests uses a syringe?
  • NACE-CIP1-001 Exam Question 8

    Removal of welds splatter is required:
  • NACE-CIP1-001 Exam Question 9

    According to SSPC PA 2 a Spot Measurement is:
  • NACE-CIP1-001 Exam Question 10

    You are the NACE Inspector on a job where ISO ST 3 has been specified. The Contractor normally works to SSPC standards and been referencing SSPC SP 3.
    Could this have any impact on the final surface preparation appearance?