NRN-522 Exam Question 31

NetAct shows an AirScale gNB as 'Connection Lost' although there has been no reported power outage at the site. What should the NOC engineer check FIRST?
  • NRN-522 Exam Question 32

    A NOC engineer is considering performing a remote factory reset on a base station as a troubleshooting step for a persistent issue. What is the most significant risk of this action if performed without proper preparation?
  • NRN-522 Exam Question 33

    Before granting a new NOC engineer remote access credentials to production AirScale sites, what should be verified according to Nokia's operational security practices?
  • NRN-522 Exam Question 34

    A base station has the necessary software installed to support a new advanced scheduling feature, but the feature remains inactive. The NOC engineer is informed that a license-related step is required. What is the most likely explanation?
  • NRN-522 Exam Question 35

    After a remote configuration change causes unexpected cell behavior, and the automatic fallback mechanism does not fully resolve the issue, what is the most appropriate next step for the NOC engineer?