NCM-MCI-5.15 Exam Question 21

An administrator receives a notification that storage in a Nutanix cluster is unavailable. The cluster consists of five nodes and is configured with a Fault-Tolerance level of 1 (FT-1).
Upon investigation, the administrator finds the following:
* All AHV hosts are powered on and the CVMs are running
* Nodes A, B, and C are connected to one top of rack switch
* Nodes D and E are connected to a second top of rack switch
* The cluster status command run on Node A shows that CVM services on nodes D and E are down Which issue is causing the storage outage?
  • NCM-MCI-5.15 Exam Question 22

    A customer needs a DR solution designed around the following requirements:
    * There are 8 ms of latency between Sites A and B
    * The administrator needs the shortest RPO/RTO possible
    * Application consistent snapshots are required
    * Use of Nutanix VSS
    Which Data Protection Method should be used?
  • NCM-MCI-5.15 Exam Question 23

    Refer to the exhibit.

    An administrator receive the warning massages shown in the exhibit while validating cluster conversion from EXSi to AHV.
    What should the administrator do to address this warning in v Center Server?
  • NCM-MCI-5.15 Exam Question 24

    An administrator has a custom backup application that requires a 2TB disk and runs in Windows. Throughput is considerably lower than expected.
    The application was installed on a VM with the following configuration:
    * Four vCPUs with one core/vCPU
    * 4GB of Memory
    * One 50GB vDisk for the Windows installation
    * One 2TB vDisk for the application
    What is the recommended configuration change to improve throughput?
  • NCM-MCI-5.15 Exam Question 25

    An administrator has two clusters: Site A and Site B.
    Async DR is configured between the clusters as follows:
    * Site A is the Primary Site
    * Site B is the Secondary inactive Site, no VMs running
    * Site A is fully in Production
    * Site B used as Backup/Disaster Recovery
    The customer wants to perform a planned failover between the sites.
    How should the administrator accomplish this?