NCS-Core Exam Question 31
A consultant is using the Foundation applet to create a cluster. During the process the consultant refreshes the progress bar web page and is concerned when nothing loads.
What should the consultant do to verify that Foundation has completed successfully?
What should the consultant do to verify that Foundation has completed successfully?
NCS-Core Exam Question 32
A consultant creates a new cluster using ESXi as the hypervisor. After creating the cluster, the consultant begins to run Life Cycle Manager (LCM) updates. During the LCM upgrade pre-checks, an error is returned.
Which configuration is causing this issue?
Which configuration is causing this issue?
NCS-Core Exam Question 33
After a recent installation using a flat switch, a consultant notices issues migrating the Nutanix nodes to the customer's network. The customer states that they are using VLANs on the production switch but not on the dedicated switch for IPMI. The customer does not require a manual configuration of the host and CVM.
What network changes need to be made to correct the issues?
What network changes need to be made to correct the issues?
NCS-Core Exam Question 34
An administrator needs to replace an aging SAN and move to a hyper-converged infrastructure. The existing environment consists of the following hosts that are connected to the SAN:
* 5xAIX hosts
* 3x Hyper-V hosts
* 9xESXi hosts
* 2x physical SQL Clusters(Windows Server 2012R2 hosts)
After deploying a Nutanix AHV cluster, which two actions should the administrator take to meet the requirements? (Choose two.)
* 5xAIX hosts
* 3x Hyper-V hosts
* 9xESXi hosts
* 2x physical SQL Clusters(Windows Server 2012R2 hosts)
After deploying a Nutanix AHV cluster, which two actions should the administrator take to meet the requirements? (Choose two.)
NCS-Core Exam Question 35
An administrator needs to replace the self-signed certificate on a cluster. Which two requirements must be met as part of the process? (Choose two.)