NCS-Core Exam Question 186

After a recent installation using a flat switch, a consultant notices issues migrating the Nutanix nodes to the customer's network. The customer states that they are using VLANs on the production switch but not on the dedicated switch for IPMI. The customer does not require a manual configuration of the host and CVM.
What network changes need to be made to correct the issues?
  • NCS-Core Exam Question 187

    A customer wants to expand an existing cluster with three additional nodes. After running the Foundation process on the new nodes, the customer realizes that the wrong IPs where used and the nodes are configured on a different network. The customer decides to create a new cluster instead.
    Which method should be used to recreate the cluster?
  • NCS-Core Exam Question 188

    As a part of a cluster deployment test plan, a customer asks the consultant for some additional performance and resiliency tests.
    How should the consultant best satisfy this request?
  • NCS-Core Exam Question 189

    An administrator is responsible for the following Nutanix Enterprise Cloud environment:
    * A central datacenter with a 20-node cluster with 1.5PB of storage
    * Five remote sites each with a 4-node cluster with 200TB storage
    The remote sites are connected to the datacenter via 1GB links with an average latency of 6 ms RTT. What is the minimum RPO the administrator can achieve for this environment?
  • NCS-Core Exam Question 190

    An administrator needs to initiate a new VDI project within a couple of months. Prism Central reports there are no storage resources to accommodate such workloads.
    The administrator sees many powered-off VMs and has the authority to delete test VMs powered off at least for 30 days. Test VMs belong to the Test category.
    Using Prism Central, which steps are required to identify the correct VMs to be deleted?