NCSC-Level-1 Exam Question 11
A consultant configures an ESXi cluster which will utilize a vSphere Distributed Switch (vDS). The consultant has just migrated the first host to the dvSwitch when several alerts appear within Prism Element regarding Host-to-CVM connectivity.
What is causing these alerts?
What is causing these alerts?
NCSC-Level-1 Exam Question 12
A consultant successfully installs the Foundation VM on a laptop and needs to ensure the VM can communicate externally.
Which two configuration changes should the consultant make next? (Choose two.)
Which two configuration changes should the consultant make next? (Choose two.)
NCSC-Level-1 Exam Question 13
A customer racks all nodes in the new cluster. The customer does not allow IPv6 for node discovery.
The consultant is not allowed to use the consultant's own flat switch in the customer's environment.
Which step should the consultant take to resolve this issue?
The consultant is not allowed to use the consultant's own flat switch in the customer's environment.
Which step should the consultant take to resolve this issue?
NCSC-Level-1 Exam Question 14
Which two components must be identified to validate that software compatibility requirements are met for Nutanix Cluster Installation? (Choose two.)
NCSC-Level-1 Exam Question 15
A consultant is preparing to add new nodes into an existing cluster. The current cluster AOS version is 5.8. The new expansion node is currently running AOS 5.9 code. The cluster must continue to run at its current AOS version.
Which method can be used to successfully add the node?
Which method can be used to successfully add the node?