NCSE-Core Exam Question 76

A customer asks for a quote for a hybrid cluster to run general purpose VMs and an ERP application. The customer has a VSAN ReadyNode quote already and is looking for a comparable Nutanix solution. They share the following bill of materials
* 3 Hosts
* 2x E5-2640v4 CPUs
* 512GB RAM
* 1 x 480GB SSD
* 2 x 8TB HDD
* 2 x 1GB NIC
What are two reasons to avoid sizing to match a competitor's bill of materials? (Choose two)
  • NCSE-Core Exam Question 77

    An existing customer wants to upgrade their non MW hypervisor to the most recent version The customer needs to confirm thee the hypervesor is supported on their AOS version.
    Where on the Support Portal is this information located?
  • NCSE-Core Exam Question 78

    An administrator is managing multiple Windows and Linux VMs connected to Nutanix Volumes. The Linux VMs are experiencing intermittent connectivity issue. The Windows VMs do not experience the same issue.
    Which option should the administrator use to resolve this issue?
  • NCSE-Core Exam Question 79

    Refer to the exhibit.

    In Sizer, in which two ways can an SE accommodate a specific number of physical host-based software licenses that a customer has available for a project? (Choose two)
  • NCSE-Core Exam Question 80

    What is an important consideration when using RVTools output for sizing a solution?