C-TS422-2020 Exam Question 1

What does it mean for the production planner when MRP works with infinite capacities?
  • C-TS422-2020 Exam Question 2

    You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?
  • C-TS422-2020 Exam Question 3

    What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
  • C-TS422-2020 Exam Question 4

    If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement?
  • C-TS422-2020 Exam Question 5

    Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?