C-TSCM42-67 Exam Question 16
Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master.
How is the resulting firming interval specified in this scenario?
How is the resulting firming interval specified in this scenario?
C-TSCM42-67 Exam Question 17
What are the names of the objects for process integration of production orders? (Choose two)
C-TSCM42-67 Exam Question 18
Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three)
C-TSCM42-67 Exam Question 19
A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order.
The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists.
What do you have to consider for the two lists at this stage? (Choose two)
The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists.
What do you have to consider for the two lists at this stage? (Choose two)
C-TSCM42-67 Exam Question 20
What are the consequences of setting a production order to Technically Complete (TECO)? (Choose three)