C_DBADM_2601 Exam Question 1

CHALLENGE 1 - Cutover Configuration Evidence Traceability
The upgraded reporting system and the installed validation database both pass connection checks. The upgraded system's configuration value exists in monitoring notes, while the validation database value exists in the administration record. Which validation sequence is most appropriate?
  • C_DBADM_2601 Exam Question 2

    A regional cinema chain uses SAP HANA for ticketing analytics. The administrator reviews a recovery rehearsal after a scheduled backup change. The restore completes in the validation environment, but the recovered database timestamp is earlier than the recovery point listed in the operations policy. SAP HANA cockpit shows that backups are running, and the backup catalog includes several successful entries. A support coordinator suggests accepting the rehearsal because the database opened and reports can be queried.
    The constraint is that the administrator must prove recovery to the required policy point. The team must not accept a technically usable recovered database if the selected backup sequence does not meet the expected recovery target.
    Which action best resolves the recovery evidence gap?
  • C_DBADM_2601 Exam Question 3

    An engineering services firm uses an on-premises SAP HANA system for daily operational processing and a separate SAP HANA Cloud database for project analytics. After a controlled stop and start sequence during maintenance, administrators confirm that the main instance is reachable again. However, one scheduled post-maintenance validation still fails because the target database remains inactive for application use even though general service status looks normal.
    A colleague proposes restarting the full system one more time to clear any remaining inconsistency. The maintenance coordinator wants the smallest corrective action that restores the required database state without disturbing healthy components that are already back online.
    What should the administrator do next?
  • C_DBADM_2601 Exam Question 4

    A regional logistics provider is preparing an incremental move from an on-premises SAP HANA reporting database to SAP HANA Cloud. The migration worksheet lists selected reporting objects as ready, but a compatibility review note is missing for one object group. The project manager wants to start migration activities because the object count is small and the target cloud environment is available.
    The constraint is that the migration must avoid moving objects whose readiness has not been validated. The administrator must support modernization progress without converting incomplete compatibility evidence into an execution decision.
    What should the administrator do before approving the migration step?
  • C_DBADM_2601 Exam Question 5

    A regional healthcare analytics team uses SAP HANA for overnight reporting. SAP HANA cockpit shows normal database availability, but the monitoring dashboard has not updated several performance indicators since the previous evening. Users can still run reports, and no service outage is visible. A support analyst suggests ignoring the stale indicators because the database is responding to queries.
    The constraint is that the administrator must restore trustworthy monitoring before the next overnight reporting cycle. The team needs evidence that monitoring data reflects the current system state, not only that the database can execute user requests.
    Which action best addresses the monitoring issue?