C_TS422_2020 Exam Question 21
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?
C_TS422_2020 Exam Question 22
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.
C_TS422_2020 Exam Question 23
Which advanced functionality has been embedded in SAP S/4HANA? There are 3 correct answers to this question.
C_TS422_2020 Exam Question 24
Which of the following time elements does MRP use during backward scheduling for in-house production?
There are 2 correct answers to this question.
There are 2 correct answers to this question.
C_TS422_2020 Exam Question 25
What must be used in the system to plan the requirements for different subcontractors separately?