SMC Exam Question 61
Which of the following statement(s) is/are true with respect to Change in Scrum projects?
A) The Scrum Master suggests changes in consultation with the Scrum Team.
B) The Scrum Master can recommend changes based on Retrospect Sprint Meetings.
C) Changes that are beyond the tolerance level of the Product Owner may need the assistance of the Scrum Master working with the Product Owner.
D) The Scrum Master finalizes the formal change requests along with the Scrum Team.
A) The Scrum Master suggests changes in consultation with the Scrum Team.
B) The Scrum Master can recommend changes based on Retrospect Sprint Meetings.
C) Changes that are beyond the tolerance level of the Product Owner may need the assistance of the Scrum Master working with the Product Owner.
D) The Scrum Master finalizes the formal change requests along with the Scrum Team.
SMC Exam Question 62
Which of the following is/are role(s) of a Chief Scrum Master, not of a Chief Product Owner?
A) Addresses impediments that impact more than one Scrum Team.
B) Prepares and maintains the overallPrioritized Product Backlog for the large project.
C) Facilitates the Scrum of Scrums meetings.
D) Interfaces with the Program Product Owner to ensure alignment of the large project with the goals and objectives of the Program.
A) Addresses impediments that impact more than one Scrum Team.
B) Prepares and maintains the overallPrioritized Product Backlog for the large project.
C) Facilitates the Scrum of Scrums meetings.
D) Interfaces with the Program Product Owner to ensure alignment of the large project with the goals and objectives of the Program.
SMC Exam Question 63
As a Scrum Master you should be familiar with all roles and responsibilities of a Scrum Project Which role can also be described as a Value Optimizer for the project?
SMC Exam Question 64
Which of the following methods helps estimate the value provided by projects?
SMC Exam Question 65
The Scrum Master must ensure that a sustainable pace is maintained throughout every Sprint. What does sustainable pace mean in the context of Scrum?