2V0-13.25 Exam Question 21

During an initial design workshop with stakeholders, the architect was provided with an overview of the current state and other information required to proceed to the design phase.
The architect has assumed that the solution will need to support high availability for workloads.
Given the assumption, which statement should the architect document as a risk?
  • 2V0-13.25 Exam Question 22

    During a design workshop, the customer provided the following requirement:
    * Business units should not be able to interfere with the operations of a different business unit.
    As a result of this requirement, the architect makes the decision to enable multi-tenancy within VCF Automation.
    A combination of which two design implications would also need to be documented? (Choose two.)
  • 2V0-13.25 Exam Question 23

    Requirement: NSX VPC Full Services Model for single tenant, preventing BGP advertisements from being dropped due to loop detection.
    Which element should be considered in the physical network design?
  • 2V0-13.25 Exam Question 24

    An architect is designing for a greenfield VMware Cloud Foundation (VCF) solution. This would be the first VCF Fleet in the VCF solution, and the customer would like to start with a minimal footprint with the option to scale up and out later.
    Which VCF Operations deployment model should the architect choose?
  • 2V0-13.25 Exam Question 25

    What open source project does vSphere Supervisor use to automate the lifecycle management of VMware Kubernetes Service (VKS) clusters?