5V0-31.22 Exam Question 11
The architect of a multi-site VMware Cloud Foundation solution is tasked with ensuring that the prerequisites for vSAN data at rest encryption have been achieved. The existing design calls for use of the vSphere Native Key Provider. NSX-T is configured with Federation, and both sites benefit from a stretched TO and T1 network topology.
A new security policy requires the use of vSphere Virtual Machine encryption, in addition to the at-rest encryption already configured. During a failover test from Site-A to Site-B using Site Recovery Manager, the virtual machines were unable to power-on.
How does the design need to be changed to support the new requirement?
A new security policy requires the use of vSphere Virtual Machine encryption, in addition to the at-rest encryption already configured. During a failover test from Site-A to Site-B using Site Recovery Manager, the virtual machines were unable to power-on.
How does the design need to be changed to support the new requirement?
5V0-31.22 Exam Question 12
Which two requirements are needed to add new hosts to an existing VI workload in a VMware Cloud Foundation environment? (Choose two.)
5V0-31.22 Exam Question 13
An administrator needs additional capacity on a vSAN cluster. Each host currently has only one disk group.
Which two approaches can be used to expand storage capacity in this situation? (Choose two.)
Which two approaches can be used to expand storage capacity in this situation? (Choose two.)
5V0-31.22 Exam Question 14
A vSphere administrator is tasked with enabling Workload Management on a VMware Cloud Foundation Workload Domain.
Which three components are configured as part of the Supervisor Cluster control plane after this task is completed? (Choose three.)
Which three components are configured as part of the Supervisor Cluster control plane after this task is completed? (Choose three.)
5V0-31.22 Exam Question 15
A VCF architect collected the following requirements when designing the expansion of a new VI Workload Domain with twenty four vSAN Ready nodes, each with a dual-port 25Gbps network interface card:
* Provide scalable high-performance networking with layer-3 termination at top-of-rack
* Protect workloads from switch/NIC/rack failure
* Provide isolation for DMZ workloads
* Provide at-least 25Gbps dedicated bandwidth to backup traffic
* Easily accept workloads on traditional VLAN-backed networks
* Fully-supported by VMware
Which three design considerations meet all of these requirements? (Choose three.)
* Provide scalable high-performance networking with layer-3 termination at top-of-rack
* Protect workloads from switch/NIC/rack failure
* Provide isolation for DMZ workloads
* Provide at-least 25Gbps dedicated bandwidth to backup traffic
* Easily accept workloads on traditional VLAN-backed networks
* Fully-supported by VMware
Which three design considerations meet all of these requirements? (Choose three.)