CCP Exam Question 61

You are analyzing historic unit costs for 18'' Class 5 reinforced concrete pipe is a database. The unit costs include all costs-material, labor, equipment, and other, for the excavation, bedding, pipe and backfill. Refer to the following table:

What is the median unit cost?
  • CCP Exam Question 62

    An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.
    Answer the question using a straight line depreciation and a 10% interest rate.
    The following question requires your selection of CCC/CCE Scenario 17 (4.2.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
    Present worth calculations is represented by which of the following equations?
  • CCP Exam Question 63

    You have recently been appointed as the Cost Engineer to oversee process improvement projects for a Discrete Part Manufacturer. You have been asked to calculate the CPI on a project initiated to implement a Value Stream Mapping Initiative. The accountant is only able to provide you with BAC and EAC figures of $ 5000 and 57500 respectively. The CPI is:
    unable to be calculated from the information given
  • CCP Exam Question 64

    Which of the following is NOT a type of float?
  • CCP Exam Question 65

    You have been hired as the cost engineer for a mechanical contractor and have been provided the following information:

    What is the schedule performance index (SPI)?