Online Access Free CEM Exam Questions

Exam Code:CEM
Exam Name:Certified Energy Manager (CEM)
Certification Provider:AEE
Free Question Number:132
Posted:Sep 08, 2025
Rating
100%

Question 1

What is the purpose of monitoring energy consumption?
SELECT THE CORRECT ANSWER

Question 2

An energy-saving project costs $540,000. The project will have maintenance costs of $25,000 per year. The energy savings from the project are $160,000 per year. The project has a life of 10 years with no salvage value. The minimum attractive rate of return (MARR) is 10%. Using end-of-year cash flows, calculate the net- present value (NPV) of the project.

Question 3

A 25-kW motor, at full load, drives a centrifugal fan that produces 160,000 liters per second (l/s) of ventilation air. If the fan speed is reduced to a flow rate of 150,000 l/s, what is the new load on the motor?

Question 4

Which of the following is NOT a renewable-energy resource?
SELECT THE CORRECT ANSWER

Question 5

A 50-Hz alternating current (AC) induction motor has 3 pole pairs (6 poles). What is the synchronous speed of the motor?

Add Comments

Your email address will not be published. Required fields are marked *

insert code
Type the characters from the picture.